DCSP Architects Home Portfolio of Work, Current Projects, Recent Projects CSP Profile, AboutUs, Size & Structure, People, Associations, Recruitment News Contact Us  

April 2010 – Planning

St Marys GAA receive Planning Permission for their new proposed town centre pitch and dressing room facilities at “The Rocks”. This exciting project will regenerate the area and encourage usage “The Rocks” as a true community facility. It will also strengthen and transform ST Marys GAA with a top level pitch on their doorstep. The new club facility is being designed as part of the master plan to provide a new Family resource Centre and a community Child care centre.

 

April 2010 – Schools of the future conference
Director John Conroy attended the very informative 1 day conference in Croke Park. Hosted by CMG with informative presentations in current design trends, future needs, funding issues and

 

April 2010 - Summer works schemes
Confirmation received that the eight summer works applications totaling over €350,000 were successful – the works will range from window replacement to entire roof replacement.

 

April 2010 – Faythe School
The first four of the refurbished classrooms are handed back to the school. The classrooms now have an external insulation façade system and double glazed windows, with interactive white boards, new heating & electrical, new floor/wall/ceiling finishes and bright new colour schemes. The board of management and students are delighted with the end result.

 

March 2010 – Passive House Planning Pack (PHPP) software course
Architectural technician Aileen Ryan is attending the two day course PHPP in Limerick.

 

Feb 2010 - Passive House Design
Great news! – Confirmation received that our director Gary Morris passed the CEPHD exams and is now one of only five certified Passive House designers in Ireland.

 

January 2010 – Screen school
“Ground break” on the refurbishment and extension of the 6 classroom school. The entire school – teachers and students have decamped to temporary accommodation – gratefully provided by the Shelmalier GAA club.

 

January 2010 – Faythe School
“Ground break” on the refurbishment of the 16 classroom school – the project is split in 8 phases over a 5 month project.

 

Archive News 2009

DCS+P Architects Wexford | Dublin Design Cost Studios Group
Architecture | Building Surveyors | Cost Consultantcy | Project Management

Wexford Office Trinity House, Trinity Street, Wexford T +353 (0)53 912 4990 E info@dcsp.ie

Sitemap | Links | Contact Us | Privacy

Designed by Graphedia